Impact Windows for Florida Condominiums: SIRS and Milestone Inspection Requirements

Last updated: September 2026. Maintained by the Max Guard technical team based on current Florida statutes and Department of Business and Professional Regulation (DBPR) guidance.

Florida’s condominium safety laws changed how associations plan window and door replacement. Two requirements now drive the timeline for most multi-story buildings: Milestone Inspections and Structural Integrity Reserve Studies (SIRS).

A Milestone Inspection checks a building’s structural and life-safety condition at set age thresholds. SIRS is a financial planning requirement — it forces associations to reserve funds for specific components, including windows and exterior doors, without the option to waive that funding. Together, the two laws mean window replacement is now a scheduled, budgeted project for many associations, not a discretionary one. This guide covers what each requirement means and how associations and commercial owners typically approach the resulting work.

Why Condo Associations Are Addressing Windows Now

Both requirements trace back to Florida’s building safety reforms after the 2021 Surfside collapse. They work together but do different jobs. A Milestone Inspection, performed by a licensed engineer or architect, assesses structural condition. SIRS determines how much the association must reserve to repair or replace specific components over time.

Many associations are now handling both at once: using inspection findings to identify problems, and SIRS-mandated reserves to pay for the fix. That combination is why windows and exterior doors — flagged in both processes — have moved up the capital planning list faster than ordinary wear-and-tear would explain.

Milestone Inspection Requirements

Florida Statute § 553.899 requires buildings three stories or taller to complete a Milestone Inspection, performed by a licensed architect or engineer. The standard trigger is the building’s 30th year, measured from its certificate of occupancy date. Inspections repeat every 10 years after that.

Local enforcement agencies can move the trigger to 25 years for buildings near the coast, citing faster wear from saltwater exposure.

Deadlines for buildings that already crossed the age threshold when the law took effect:

  • Reached 30 years before July 1, 2022 → inspection due December 31, 2024
  • Reached 30 years between July 1, 2022 and December 31, 2024 → inspection due December 31, 2025

Both dates have now passed. Most eligible buildings should already be inspected — and many are now in the next phase: reviewing findings and funding repairs.

The inspection itself runs in two phases. Phase 1 is a visual assessment. If the inspector finds substantial deterioration, a more detailed Phase 2 follows, with further testing and a repair timeline. Window and door assemblies are commonly reviewed in this process, especially on older buildings where the original glazing predates current wind-load standards.

SIRS Reserve Requirements for Windows and Exterior Doors

A Structural Integrity Reserve Study determines how much a condominium association must reserve for a defined list of structural and life-safety components. Per DBPR guidance, that list includes:

  • Roofing
  • Load-bearing walls and primary structural systems
  • Fireproofing and fire protection systems
  • Plumbing and electrical systems
  • Waterproofing and exterior painting
  • Windows and exterior doors
  • Any other component with a replacement cost over $25,000

Associations cannot vote to waive or underfund reserves for this list — unlike reserves for cosmetic items, where waivers are still allowed.

Associations that existed before July 1, 2022 had to complete their initial SIRS by December 31, 2025. Reserve funding based on that study began January 1, 2026, and the study must be refreshed every 10 years. For most eligible condominiums, this means window replacement already has a funding line — the board doesn’t need to build the case for it from scratch.

RequirementWhat It CoversKey Deadline
Milestone Inspection (F.S. § 553.899)Structural/life-safety assessment; buildings 3+ storiesYear building turns 30 (or 25 if coastal), then every 10 years
SIRS (Ch. 718, DBPR guidance)Reserve funding for windows, exterior doors, roof, structure, waterproofing, plumbing, electrical, fire protectionInitial study due 12/31/2025; funding began 1/1/2026; refreshed every 10 years
Competitive bidding (F.S. § 718.3026)Contracts over 5% of annual budget (incl. reserves)Applies at time of contract execution

Competitive Bidding for Association Contracts

Florida Statute § 718.3026 requires condo associations to get competitive bids before signing a contract over 5% of the association’s total annual budget, including reserves.

A few categories are exempt:

  • Contracts with association employees
  • Professional services — legal, accounting, architectural, engineering, licensed community association management
  • Emergency contracts
  • Sole-source vendors (the only supplier within the county)

Associations with 10 or fewer units can opt out of bidding entirely, with a two-thirds owner vote.

In practice, a project large enough to trigger this threshold needs comparable, itemized proposals from more than one contractor — covering specs, Florida Product Approval or NOA documentation, and timeline — before the board can approve it.

Commercial Properties: Scope and Code Differences

Commercial and mixed-use buildings follow different code requirements than residential or condo-residential construction. The differences show up in three places: pressure ratings, testing, and documentation.

Residential / Condo-ResidentialCommercial (South FL HVHZ)
Design pressureStandard residential ratingsOften +65/−80 psf or higher, per ASCE 7
Impact testingLarge-missile testLarge- and small-missile test (ASTM E1996) + cyclic pressure
Frame constructionStandard residential profilesHeavier extrusions, closer mullion spacing, reinforced corners
Product approvalProduct-level FL Product Approval or NOAEvery component — frame, glass, hardware, anchoring — needs its own approval

Every component of a commercial glazing assembly — frame, glass, hardware, and anchoring — needs its own Florida Product Approval or Miami-Dade NOA listing. Because of that added engineering and documentation load, commercial project scope varies a lot by building type and use. Max Guard evaluates commercial projects case by case.

Products and Installation for Condominium and Commercial Buildings

Max Guard installs impact windows and impact doors from Pella, PGT, Andersen, and Shwinco, built to meet Florida’s HVHZ or WBDR standards depending on the property’s county. For condo projects, this usually means one board-approved spec applied consistently across units — not unit-by-unit variation, which creates both an inconsistent exterior and a compliance gap between units.

Financing Considerations

Condo associations typically fund large window projects through reserves (including SIRS-mandated reserves once funded), a special assessment, or association-level financing. Commercial owners more often use conventional commercial or property-secured loans.

Max Guard is an approved PACE contractor for qualifying residential projects. Financing for association-level or commercial projects depends on ownership and contract structure — worth a direct conversation with a Max Guard representative. Learn more about financing.

Frequently Asked Questions

Do impact windows and doors count toward Florida’s SIRS reserve requirements?

Yes. Windows and exterior doors are one of the components associations must keep fully reserved under Florida’s SIRS requirement, alongside roofing, structure, waterproofing, plumbing, electrical, and fire protection.

Associations can’t waive or reduce this reserve category, unlike reserves for cosmetic items. That means most condominiums that completed a SIRS already have a funding line for window and door replacement — it doesn’t need to be a separate capital request. The exact amount and timeline come from the individual study prepared for that building, so confirm specifics with your SIRS provider or a licensed reserve specialist rather than general guidance.

What triggers a Milestone Inspection, and has my building already missed the deadline?

Buildings three stories or taller must complete a Milestone Inspection by the end of the year they turn 30, or 25 if the local enforcement agency requires it due to coastal proximity. Buildings that turned 30 before July 1, 2022 had a deadline of December 31, 2024. Buildings that turned 30 between July 1, 2022 and December 31, 2024 had until December 31, 2025. Both dates have passed. If your building crossed either threshold, the inspection should already be done or underway. If you’re not sure where your building stands, your local building department can confirm status and any local variations in enforcement.

Does our association need competitive bids before hiring a window and door contractor?

Generally, yes, once the contract exceeds 5% of the association’s total annual budget, including reserves. Florida Statute § 718.3026 sets that threshold, with exceptions for sole-source vendors, professional services, and emergency contracts. Associations with 10 or fewer units can opt out entirely with a two-thirds owner vote. For a project large enough to trigger the requirement, the board typically needs itemized, comparable proposals from more than one contractor, covering product specs, applicable approval documentation, and timeline, before signing.

How is commercial-grade glazing different from residential impact windows?

Commercial buildings generally need higher design pressure ratings than residential construction, especially in South Florida’s high-velocity hurricane zone. Commercial glazing must pass both large- and small-missile impact testing under ASTM E1996, not just large-missile testing, plus cyclic pressure testing. Frame assemblies typically use heavier extrusions and closer mullion spacing. Every component — frame, glass, hardware, anchoring — needs its own Florida Product Approval or Miami-Dade NOA listing. That added complexity is why commercial scope gets evaluated project by project.

Does Max Guard work with condominium associations and commercial properties?

Max Guard works with condominium associations on impact window and door replacement, including board proposal documentation and building-wide installation coordination. Commercial projects are evaluated case by case, depending on building type, scope, and code requirements. If you’re an association or property owner with a specific project, the fastest way to get a scope answer is to contact Max Guard directly.

What financing options exist for a condo-wide or commercial window replacement project?

Condo associations typically fund large window projects through reserves — including SIRS-mandated reserves — a special assessment, or association-level financing arranged separately from individual owner financing. Commercial owners more commonly use conventional commercial or property-secured loans. Max Guard is an approved PACE contractor for qualifying residential projects. Association-level and commercial financing structures vary by project, so it’s worth discussing your specific situation directly with a Max Guard representative. Learn more about financing.

Related reading: Are Hurricane Windows Required in Florida? · Are Impact Doors Required in Florida? (residential requirements)

References

  • Florida Statute § 553.899 — Building safety; condominium and cooperative buildings (Milestone Inspections). flsenate.gov
  • Florida Statute § 718.3026 — Contracts for products and services; bidding requirements. flsenate.gov
  • Florida Department of Business and Professional Regulation — Condominium Information & Resources, SIRS and Milestone Inspection FAQs. condos.myfloridalicense.com

Questions about a specific building, association, or commercial project? Contact Max Guard to discuss scope and documentation.