4.7 from 540+ Reviews

Impact Window Permits in Florida: County-by-County Guide (2026)

Reviewed by Peter Bulger, Owner, Max Guard Hurricane Windows & Doors · Last verified against official Florida and county sources: October 23, 2026

Do you need a permit to replace windows in Florida? In most cases, yes. Florida law makes it unlawful to alter or repair a building without first obtaining a permit from the local enforcing agency, and window and door replacements are treated as permitted work by building departments across South Florida. The permit is issued by your city’s building department, or by the county if the home is in an unincorporated area.

Max Guard handles permits and inspections as part of every installation.

Florida Impact Window Permit Rules at a Glance

RuleWhat it means for window and door replacement
Permit requiredGenerally yes. F.S. 553.79(1)(a) requires a permit before a building is altered or repaired, unless the law provides an exception.
Who issues itThe city or town building department, or the county building department for unincorporated areas.
Product approvalEach product needs a Florida Product Approval (FL#) or a Miami-Dade NOA that covers the exact model, size, and installation.
Code zoneMiami-Dade and Broward are in the High-Velocity Hurricane Zone (HVHZ). Counties from Palm Beach north follow Wind-Borne Debris Region (WBDR) rules where they apply.
Notice of CommencementRequired when the direct contract is greater than $5,000 (F.S. 713.135). A copy is filed before the first inspection.
$7,500 exemption (HB 803)Since July 1, 2026, some single-family work under $7,500 is exempt, but not structural work or properties in a flood hazard area. Windows and doors generally still need a permit.

Impact Window Permits by County

Max Guard installs impact windows and doors in six South Florida counties. Choose your county for a detailed guide, or use the official link to reach the building department that serves unincorporated areas.

CountyCode zoneUnincorporated areasOur guide
Palm BeachWBDR (all of unincorporated Palm Beach County, per the County)PBC Building Division · ePZB portalPalm Beach County permit guide
Town of Jupiter permit guide
City of Palm Beach Gardens permit guide
BrowardHVHZBroward Building Code Division (Broward Municipal Services District)Coming soon
MartinOutside HVHZMartin County Building DepartmentComing soon
St. LucieOutside HVHZSt. Lucie County Building & Code RegulationComing soon
Indian RiverOutside HVHZIndian River County / City of Vero Beach Building DivisionComing soon
BrevardOutside HVHZBrevard County Planning and DevelopmentComing soon

Outside the HVHZ, whether a property falls in the Wind-Borne Debris Region depends on its design wind speed and distance from the coast. Check your county’s wind speed map or ask the building department.

Step 1: Find Out Who Issues Your Permit

A mailing address does not confirm which building department handles your permit. Many homes with a city mailing address are in unincorporated county land, and several cities issue their own permits even inside a county that runs its own building department. A few examples from official sources:

  • Palm Beach County: 39 municipalities. A Property Appraiser PCN starting with 00 means unincorporated county.
  • St. Lucie County: Fort Pierce, Port St. Lucie, and St. Lucie Village issue their own permits; the County covers unincorporated areas.
  • Indian River County: one Building Division serves both the unincorporated county and the City of Vero Beach.
  • Broward County: the County division serves the Broward Municipal Services District; cities such as Fort Lauderdale run their own departments.

Your county Property Appraiser’s parcel record is the fastest way to confirm the jurisdiction before you apply.

What a Window or Door Permit Usually Requires

Each building department publishes its own checklist, but window and door replacement permits in South Florida typically ask for:

  • a completed permit application signed by a licensed contractor or by the owner as owner-builder
  • a layout showing each opening being replaced, with sizes and egress rooms identified
  • product approvals (FL# or NOA) for every window and door, matching the exact model and size
  • documentation that each product meets the design pressure required for its opening
  • a recorded Notice of Commencement when the job is over $5,000, filed before the first inspection

Learn how to verify an NOA or Florida Product Approval and what design pressure (DP) ratings mean.

HVHZ vs. Wind-Borne Debris Region

The zone your home is in changes which products can be approved for it. In the HVHZ (Miami-Dade and Broward), products must carry an approval valid for HVHZ use, such as a Miami-Dade NOA or a Florida Product Approval marked for the HVHZ. In the Wind-Borne Debris Region, glazed openings must be impact-resistant or protected by an approved covering, and a Florida Product Approval for the specific product is the standard requirement. See the full HVHZ vs. WBDR comparison.

Let Max Guard Handle the Permit

On every project, Max Guard confirms who issues the permit for your address, selects products with the right approvals for each opening, prepares and submits the permit package, coordinates the Notice of Commencement with you, and schedules the inspections through final approval.

Rated 4.7 across 540+ verified reviews (see reviews). We offer flexible financing options, including 0% interest plans and PACE financing.

This guide summarizes publicly posted requirements as of the date above and is not legal advice. The building department that issues your permit makes the final determination for each project. See all Max Guard service areas.

Frequently Asked Questions

Do I need a permit to replace windows in Florida?

In most cases, yes. Florida Statute 553.79 makes it unlawful to alter or repair a building without first obtaining a permit from the local enforcing agency, and building departments across South Florida treat window and door replacement as permitted work. A few narrow exemptions exist, so confirm with the department that serves your address.

It depends on the address. Homes inside a city or town use that municipality’s building department. Homes in unincorporated areas use the county building department. A mailing address does not confirm the jurisdiction, so check the parcel record on your county Property Appraiser’s website.

Generally, no. The exemption added to Section 553.79 by HB 803, effective July 1, 2026, does not apply to structural, electrical, plumbing, mechanical, or gas work, or to properties in a flood hazard area. Local building departments list windows, doors, and shutters among the work that still requires a permit.

Under Florida Statute 713.135, a Notice of Commencement is required when the direct contract is greater than $5,000. The owner signs it, it is recorded with the county Clerk, and a copy must be filed with the building department before the first inspection.

Miami-Dade and Broward. Products installed there must carry an approval valid for HVHZ use, such as a Miami-Dade NOA or a Florida Product Approval marked for the HVHZ. Palm Beach, Martin, St. Lucie, Indian River, and Brevard counties are outside the HVHZ.

Yes. A licensed contractor typically applies for and manages the permit and inspections. You can verify a contractor’s license on the Florida DBPR license search. Homeowners may also apply as owner-builders, taking on the contractor’s responsibilities for the work.